Industrial Slabs in Rowlett, TX

Dallas-Fort Worth industrial developers demand concrete slabs that support heavy machinery, racking systems, and 24/7 operations. Our ACI 360R-compliant industrial slabs deliver the flatness tolerances and joint spacing needed for manufacturing facilities, warehouses, and distribution centers across North Texas.

Industrial Slabs Overview

Industrial slab construction requires precise engineering for heavy loads, minimal cracking, and long-term durability. We coordinate with industrial engineers and equipment manufacturers to deliver slabs that meet stringent flatness tolerances while accommodating utility penetrations, expansion joints, and future modifications in the region's growing industrial sector.

What We Deliver

  • • ACI 360R-compliant joint layouts with proper spacing for temperature and shrinkage control
  • • FF 25-50 flatness tolerances and FL 15-35 levelness standards for industrial equipment
  • • Post-tensioned slab systems for heavy loading per PTI DC10.5-12 specifications
  • • Industrial-grade concrete mixes with 4,000-8,000 psi compressive strength
  • • Vapor barriers and moisture mitigation systems per ASTM E1745
  • • Precision laser-guided screeding for exact flatness requirements

Why Builders Choose Us

  • • Certified Industrial Concrete Flatwork Technician certification across our crew
  • • Experience with Dallas-Fort Worth's major industrial developers and logistics firms
  • • Integrated design with racking manufacturers and equipment suppliers
  • • Proven performance in high-bay warehouses and manufacturing facilities
  • • Advanced testing capabilities including F-number verification
  • • Emergency repair capabilities for operational industrial facilities

How Our Process Works

  1. Equipment loading analysis and slab thickness design per ACI 360R
  2. Moisture testing and vapor barrier installation per ASTM F710
  3. Precision formwork and joint layout per industry best practices
  4. Laser-guided concrete placement and screeding operations
  5. Post-placement grinding and F-number verification testing
  6. Final inspection and certification for equipment installation

Related Services

Explore services frequently paired with Industrial Slabs on commercial projects across Rowlett, TX.

Where We Work

Our crews support projects across Rowlett and the greater Dallas-Fort Worth metro.

View All 50 Locations

Frequently Asked Questions

Industrial slab construction in Rowlett, TX requires specialized engineering for heavy loads and strict tolerances. Here are answers to common industrial concrete concerns:

What flatness tolerances do you achieve for industrial slabs in Rowlett, TX?

We consistently deliver FF 25-50 flatness and FL 15-35 levelness per ASTM E1155, suitable for most industrial equipment. Higher tolerances (FF 15-35) are available for precision manufacturing operations.

How do you handle moisture issues in industrial slabs in Rowlett, TX?

We install 10-15 mil vapor barriers per ASTM E1745 and conduct calcium chloride testing to ensure moisture levels stay below 3 lbs/1000 sq ft/24 hrs. Our warranty requires annual moisture monitoring.

What joint spacing do you use for industrial slabs in Rowlett, TX?

Joint spacing follows ACI 360R guidelines: 24-30 feet for interior joints and 1.5 times slab thickness for perimeter spacing. We use dowel bars and load transfer systems at all construction joints.

How do you accommodate equipment pads in industrial slabs in Rowlett, TX?

We coordinate with equipment manufacturers for isolated pads with thickened sections and proper reinforcement. Pads are designed per UBC load requirements with additional rebar for point loading.

What testing do you perform on industrial slabs in Rowlett, TX?

We conduct slump testing, air content verification, 28-day compressive strength testing, and F-number verification. All testing follows ASTM standards and is performed by ACI-certified technicians.

How long does curing take for industrial slabs in Rowlett, TX?

We implement 28-day moist curing per ACI 308R, with plastic sheeting and curing compounds. Light equipment loading begins at 7 days, full loading at 28 days with documented strength verification.