Industrial slab construction in Rowlett, TX requires specialized engineering for heavy loads and strict tolerances. Here are answers to common industrial concrete concerns:
What flatness tolerances do you achieve for industrial slabs in Rowlett, TX?
We consistently deliver FF 25-50 flatness and FL 15-35 levelness per ASTM E1155, suitable for most industrial equipment. Higher tolerances (FF 15-35) are available for precision manufacturing operations.
How do you handle moisture issues in industrial slabs in Rowlett, TX?
We install 10-15 mil vapor barriers per ASTM E1745 and conduct calcium chloride testing to ensure moisture levels stay below 3 lbs/1000 sq ft/24 hrs. Our warranty requires annual moisture monitoring.
What joint spacing do you use for industrial slabs in Rowlett, TX?
Joint spacing follows ACI 360R guidelines: 24-30 feet for interior joints and 1.5 times slab thickness for perimeter spacing. We use dowel bars and load transfer systems at all construction joints.
How do you accommodate equipment pads in industrial slabs in Rowlett, TX?
We coordinate with equipment manufacturers for isolated pads with thickened sections and proper reinforcement. Pads are designed per UBC load requirements with additional rebar for point loading.
What testing do you perform on industrial slabs in Rowlett, TX?
We conduct slump testing, air content verification, 28-day compressive strength testing, and F-number verification. All testing follows ASTM standards and is performed by ACI-certified technicians.
How long does curing take for industrial slabs in Rowlett, TX?
We implement 28-day moist curing per ACI 308R, with plastic sheeting and curing compounds. Light equipment loading begins at 7 days, full loading at 28 days with documented strength verification.